Survey engineer inspecting an anchor position on a semi-permanent commercial structure

Search · Detect · Map · Test

Know the ground.
Test the anchor.

Site intelligence for temporary, modular and semi-permanent commercial structures, from utility records and detection through to anchor testing and recorded results.

Request a site review ↗

Know the ground before the structure arrives.

HEXCO supports contractors, structure suppliers and operators with evidence to plan around buried services, site constraints and proposed anchor locations.

The scope is tailored to the footprint, ground works, anchorage proposal, programme and outputs required by the wider project team.

From records
to results.

A coordinated survey and testing package, or an individual service where the requirement is already defined.

01 / DESKTOP
⌁

Utility searches

PAS 128 Survey Type D searches compiling available statutory utility records for the proposed site.

  • Utility-provider records
  • Site-specific search area
  • Consolidated report pack
02 / DETECTION
⌖

GPR & utility mapping

On-site detection using Ground Penetrating Radar and electromagnetic location to investigate buried services.

  • GPR and EML survey
  • Surface marking of detections
  • Positioned CAD and PDF outputs
03 / GROUND
⌁

Ground & anchor surveys

Site attendance to review proposed structure and anchor locations and record visible constraints.

  • Structure footprint review
  • Anchor-position assessment
  • Recorded observations
04 / TESTING
↟

Anchor pull testing

Trial pull-out and installed-anchor proof testing against engineer-specified loads and acceptance criteria.

  • Trial anchor testing
  • Installation proof tests
  • Results and photographic record

Important: Desktop utility searches provide available record information and do not confirm exact service positions. On-site detection, safe excavation practices and the project-specific risk assessment remain essential.

One coordinated
workstream.

The sequence is agreed around the proposed footprint, anchorage system and project programme.

  1. 01

    Define the requirement

    Review drawings, footprint, ground works, anchorage proposal and existing information.

  2. 02

    Search, detect & map

    Obtain records and undertake the agreed on-site survey and positioning.

  3. 03

    Test & report

    Complete specified testing and issue clear results, drawings and photographic evidence.